End-to-end project management and construction supervision for the upgrade of a large above-ground storage tank, covering engineering coordination, contractor management, schedule control, quality assurance, safety oversight, progress reporting, and commissioning support.
Design coordination, importation, installation, testing, and commissioning of a GRP sectional water tank system for a high-rise condominium, providing reliable domestic and utility water storage through a modular above-ground installation.
Engineering assessment, equipment retrofit, piping modification, installation, testing, and commissioning of an industrial product-transfer system designed to improve pumping capacity, operational reliability, and system maintainability.
Retrofit, equipment supply, installation, testing, and commissioning of an electric motor-driven fire pump system designed in accordance with applicable NFPA fire-protection requirements for an industrial facility in the Philippines.
Engineering, design, fabrication, testing, and delivery of 10 portable fuel polishing systems developed for on-site diesel cleaning, water separation, and contamination recovery across multiple retail fuel stations.
Design, importation, on-site assembly, testing, and commissioning of a modular GRP sectional water storage tank for an industrial facility in Tarlac.
Engineering and deployment of a skid-mounted, multi-stage fuel filtration system to recover contaminated Automotive Diesel Oil by removing free water, sediments, sludge, and suspended particulates for safe reuse.
Engineering, fabrication, installation, and testing of industrial process piping modifications and pump connections, including valves, fittings, supports, and system tie-ins for reliable utility operation.
Design, supply, installation, and commissioning of a triple-pump cooling water circulation system configured with two duty pumps and one standby unit, providing reliable flow, operational redundancy, and efficient support for the facility’s central cooling system.
Engineering design and retrofit of an API Seal Plan 58B system for an industrial process pump, improving seal reliability, operating stability, and equipment performance through proper barrier-fluid control and commissioning support.